This week they've had things moved pretty fast! Flooring is done with carpet, tile, and hardwood. Light fixtures are in and appliances are delivered. Outside we have the final graded yard. I love how the color choices look as things start to come together. Next week they will install master shower doors, plumbing fixtures, and begin fine tuning things. Sod and shrubs will also go in next week.
0 Comments
This week not a lot of things were finished but it's ok. As of today (Friday), this week they have put in the siding for the house, the stone for the fireplace, molding, finish color for the stair railing, and the microwave. They had the doors delivered to the house but have not installed all the doors yet. Ceramic tile floors are still being worked on. Because sometimes I saw them also working on the weekends, I wonder if they would have more finished this weekend, The drywall was actually put up almost completely at the end of last week (Week 9 of construction) so I think during this week they have worked on finishing the drywall and installing the cabinets. The 5-week Mechanical, Insulation, and Drywall phase of construction has ended so they will start putting in ceramic tile flooring. See Timeline to know more about the schedule. |